Welcome to Legend Architecture, LLC!
      
Current Projects
Specifications and Drawings are password protected. Please contact Legend Architecture at
715-934-2770 to receive the passwords required to view these items.

Most documents on this site require Adobe Acrobat Reader.
Click on the icon to the right for a free download
Page 1 of 1
   

WITC New Richmond Campus Addition & Alterations
           
The projects consists of a 7,600 square foot addition to the existing main Campus building,
approximately 6,400 square feet of alterations in the main Campus building and approximately 6,400
square feet of alterations in the existing Power Equipment Center building. The addition will occupy
a Welding Lab and Small Engines Lab. The alterations in the main Campus building consist of
constructing a Corridor to access the addition and altering adjacent spaces. The alterations in the
Power Equipment Center building consist of demolishing a large portion of the north interior rooms
and construction new rooms in a different arrangement, toilet room alterations and a new entry door
system. All work will have associated plumbing, HVAC and electrical work. The addition will be fully
sprinklered with a new system. The Construction Manager for the project is Derrick Commercial
Contracting, 1505 Highway 65, New Richmond, Wisconsin. (715) 246-2320. The addition and the
alterations in the Power Equipment Center building are being designed to meet the requirements of
the USGBC LEED® Silver certification process. Check this website periodically for updates related to
this project. Last updated Wednesday, March 10, 2010, 7:30 a.m. Passwords for drawings and
specifications will be available March 22, 2010. Please email your passwords requests to
legend@legendarch.com and include all company information if you wish to be added to the Bidder's
List.
 
   
 

Alterations to North Woods Community Health Center
           
The project consists of interior alteration work that will be phased during construction in order to
maintain clinic operations to the greatest extent possible. Consideration will be given to normal
construction practices and schedules so as to provide contractors with the ability to perform their
work as efficiently as possible. In general the phased approach will adhere to the following
schedule: Phase 1: Demolition and Remodeling of the Existing Registration, Waiting, Office and
Exam Room areas (areas currently occupying approximately the southwest quarter of building). Phase
2: Demolition and Remodeling of the Existing Exam Rooms, X-Ray and Nurses Station/Lab areas (areas
currently occupying approximately the northwest quarter of building). Phase 3: Demolition and
Remodeling of the Existing Offices, Physical Therapy, Toilet Rooms and support areas (areas
currently occupying approximately the northeast quarter of building). Phase 4: Demolition and
Remodeling of the Existing Exercise Room, Community Room and Corridor areas (areas currently
occupying approximately the southeast quarter of the building). A complete schedule that will
establish milestone dates and specific deadlines will be determined at the time of the
preconstruction meeting. Passwords and documents will be available November 30, 2009. Please email
password requests to legend@legendarch.com along with company information.
 
   
 

Ladysmith Housing Authority
           
Flooring replacement of 20 low income housing units on multiple sites and flooring replacement at
common areas and site work at Rusk Haven facility.
 
   
 

Page 1 of 1
    

about us ׀ current projects ׀ past projects ׀ contact us ׀ home

Legend Architecture LLC
Click to visit Northland Area Builders Association! Click to visit Hayward Area Chamber of Commerce! Click to visit the Ashland Chamber of Commerce!